Project Description:
Giordano Industrial coordinated with Liberty Coca-Cola and Vertique to support the installation of a new facility automation system at the South Brunswick, NJ location. The project included permitting, site preparation, structural modifications, utility upgrades, equipment support, and system commissioning to ensure successful integration with the facility’s existing operations and controls.
Project Details:
- Vertique automation system installation support
- Building, electrical, and plumbing permitting
- Site preparation and facility modifications
- Interior storm drain rerouting
- Structural support installation
- Electrical and communications infrastructure upgrades
- System testing, commissioning, and validation
- Project documentation and owner acceptance